Cavalio flooring & opening to INNER HALL.
A deep room with feature fireplace, wide UPVC double glazed window to front & opening to:
A STUNNING ROOM with Cavalio flooring:
Excellent range of contemporary soft-close wall & floor units with Silstone worktops & inset sink. A large island with induction hob & flush overhead extractor, combination microwave oven & wine cooler. Eye-level double oven/grill & integrated dishwasher. Larder-drawer unit & space for large fridge/freezer.
Light-filled with Roof Lantern, UPVC double glazed side window & wide bi-fold doors overlooking the gardens. Serving station with Silstone worktop & cupboards under.
Worktop with cupboard under, plumbing for washing machine & space for dryer. Bank of cupboards also housing the oil boiler & hot water cylinder. WC with washbasin. Cavalio flooring UPVC double glazed window to rear & door to outside.
Twin double wardrobes, UPVC double glazed window to rear & masked doors to:
Shower cubicle, washbasin with cupboards under & inset WC. Auto-lighting, deep nook cupboard & towel radiator.
Including fitted double wardrobes & drawer unit. UPVC double glazed window to front.
UPVC double glazed window to front.
Panelled bath, shower cubicle, washbasin with cupboards under & inset WC. Nook cupboard & towel radiator.
Entrance pillars & stone boundary wall-beds, gravelled area with flower/shrub beds & border. Concrete 2-vehicle driveway & parking leading to:
UPVC double glazed side window, single glazed rear window & side door. Strip lighting & power.
Fenced & hedged side garden area & large lawn garden with stone flagged patio & Apple trees. Oil tank & bin-store area. Outside lighting, power & cold-water tap.
(1)Freehold
(2)Council Tax Band: E
(3)EPC: New EPC commissioned
(4)PLANNING 22/00656/FULL| Full Planning Permission to Demolish Existing Garage, Replace with Master Bedroom Extension with a Semi-Glazed Link to Existing House and Reconfigure Existing Parking Arrangement to the Rear to Create 3 Off Street Parking Spaces The development hereby permitted shall be begun on or before 15th December 2025.
(5)Mains Drainage, Water & Electricity.